
During the SAT, an extensive program will be carried out in which the platform as well as the sensor weapons and communications suite will be tested.
The second frigate of 98 meters is scheduled for sea trials at the end of 2011 as the third frigate, also 98 meters long, is still under construction at the Damen yard in Vlissingen, to be launched in September this year.